
HEADS UP! Superload to Impact Travel on I-80 in Southeast Wyoming
How did your country report this? Share your view in the comments.
Diverging Reports Breakdown
HEADS UP! Superload to Impact Travel on I-80 in Southeast Wyoming
The superload will be making its way from Laramie to Medicine Bow beginning Monday, June 30. The transport will be traveling at 25-30 mph, dropping to 10 mph over bridges. The superload is 17 feet, 3 inches tall, 26 feet wide, 385 feet long, and weighs 1,484,000 pounds. Two more transformers will be moved this summer.
Schedule Details
According to WYDOT spokeswoman Andrea Staley, the superload, which is carrying a transformer, will be leaving the Laramie railyard on Monday morning and is estimated to make it onto I-80 at the Snowy Range Road on-ramp at mile marker 311 by 10:30 a.m.
From there, the superload will move west to the truck parking lot at milepost 307.
Get our free mobile app GET OUR FREE MOBILE APP
On Tuesday, July 1, the superload will leave the truck parking lot around 5 a.m. and drive to Arlington at mile marker 272 on I-80, which is anticipated to take around two hours.
From there, the superload will take Wyoming 13 to U.S. 30/287 at Rock River, ending its route in Medicine Bow.
Stoppages and Travel Delays Should Be Expected
Staley says due to the size of the superload — it’s 17 feet, 3 inches tall, 26 feet wide, 385 feet long, and weighs 1,484,000 pounds — both lanes of travel will be used.
“Not to cause damage to the interstate the transport will be traveling at 25-30 mph, dropping to 10 mph over bridges,” Staley said in a release. “Stoppages and travel delays should be expected.”
Staley says the transport is anticipated to return to the Laramie railyard the second week of July.
She says two more transformers will be moved this summer, with schedule details to come.
Source: https://kgab.com/wyoming-superload-alert/